Quoting is costing about $155,000 a year in gross margin.

Three weeks inside the quoting workflow at Holcombe Mechanical, from inquiry to signed proposal. What runs it, what it costs, where each task belongs, and the first build we would recommend.

Prepared forBrian Aldridge, President CompanyHolcombe Mechanical ScopeQuoting, inquiry to signed proposal BasisNine live bids, 214 bid records

This document belongs to Holcombe Mechanical. It stands on its own whether or not any further work happens, and every number in it is drawn from your own records, and each one says which record it came from.

01What we found

Margin varies by estimator on jobs that are genuinely comparable, because the adjustments that make the difference are not written down.

Across the last twelve months Holcombe realized 22.1 percent gross margin on $8.6M of install and retrofit work. Had every job been priced and run the way your senior estimator prices and runs his, the figure would have been 23.9 percent. That difference is 1.8 points, or about $155,000 a year.

The cause is specific. Doug Wetzel adjusts the workbook price for the things the workbook cannot see: rooftop access on grocery sites, prevailing-wage jobs, customer payment history, which crew is available. Those adjustments are sound and they are consistent. They exist nowhere except in the bids he personally prices, so the other two estimators price without them, and the margin follows.

Not everything here is broken, and it matters to say so. Your takeoff tooling feeds pricing cleanly. Your win rate is normal for the trade and does not vary meaningfully by estimator. The workbook itself is a real, competent pricing instrument. The problem is confined to how the workbook is kept and what sits on top of it.

$155,000
Measured annual gross margin gap on project work
4.5 pts
Margin spread between estimators on 34 comparable jobs
28%
Of estimating time spent on questions a maintained source would answer

What we recommend

Write down the adjustment layer, fix how the workbook and vendor pricing are kept, and put a drafter in front of the estimators that prices from both and cites every number. Pilot it on rooftop-unit replacement retrofits, where the gap is widest and the jobs repeat. Of the $155,000, we would expect to reach $85,000 to $110,000 inside twelve months, and we would agree the measures up front so you can judge it in your own numbers.

02Method

We watched nine live bids and then reconciled what we saw against twelve months of records.

Interviews about a workflow return the procedure. We wanted quoting as it is done today, so the three weeks were spent alongside Doug Wetzel, Alan Prewitt and Cody Sturgill through nine bids in progress: the inquiry, the site walk, the takeoff, the workbook, the adjustments, the proposal and the follow-up. Where what we saw differed from what the procedure said, we recorded both.

The observed work tells you how and why. It does not tell you how much, so the second half of the diagnosis reconciled it against your records: 214 bid files for the trailing twelve months, job costing out of QuickBooks for the 58 that were won and closed, the estimating workbook and its two variant copies, the labor rate sheet, and the vendor quote traffic in the shared mailbox.

What we could measure, and what we could not

  • Measured from your recordsQuote turnaround, bids submitted and won by estimator and job type, bid margin against realized margin on closed jobs, and equipment cost variance against the workbook.
  • Measured by observation, and therefore a sampleEstimator hours per bid and how those hours are spent. Nine bids is enough to show the shape and not enough to be precise. The hours figures in this document carry that caveat wherever they appear.
  • Could not be measuredWhy a bid was lost. Holcombe does not capture loss reasons, and neither our observation nor your records can reconstruct them. This is the single largest hole in the picture and it is worth closing whatever else you decide.

Two of the nine observed bids were rooftop-unit replacements at Bexley Foods, including BEX-118, which appears again in the build section as the pilot example.

03Current state

A quote takes 6.4 days, and the two slowest steps are the two that wait on information.

The workflow itself is sound and everyone runs it the same way. What varies is how long each step takes, and the variation concentrates in the two steps that depend on information held somewhere else: pricing from the workbook, which waits on current equipment costs, and the adjustment step, which waits on Doug.

Pricing and adjustment take a quarter of the elapsed time and carry all of the rework.
The seven phases of a project quote, drawn to scale. Marked in red: where the observed rework happens.
Median business days, 214 bids
6.4 days, median 0.40.61.8 1.20.90.7 0.8 Inquirylogged Bid orno bid Site walk Takeoff Workbookpricing Adjustments Proposalout FastPIPE andFastDUCT feed it 1.9 hrs a bid chasingcurrent vendor prices0.6 hrs reconcilingworkbook versions Doug's adjustments,applied only tohis own bids
Phase medians are computed from the 214 bid records and sum to the 6.4-day median. The marked span, workbook pricing plus adjustments, is 1.6 days. Hours per bid come from the nine observed bids and are a sample.

Twenty-two of the 214 bids went out after the customer's stated deadline. That is 10.3 percent of everything Holcombe bid last year, and it is the finding Brian described on the first call.

04The inventory

Everything quoting needs is written down, and four of the nine sources have no owner and no review date.

Holcombe is not a company that keeps its pricing in somebody's head. The pricing is written down, in the ordinary ways companies write it down, and most of it is good. What is missing is custody: which copy is current, who owns it, when it was last checked, and where the reasoning behind a number is recorded.

The workbook and the vendor pricing are the two sources every bid depends on, and both are the least maintained.
Nine sources the quoting workflow reads from, with custody assessed against the same standard.
Nine sources
SourceWhere it livesOwner and reviewCustody
Estimating workbook (assemblies, labor units, multipliers) SharePoint, plus two personal copies No owner. Last full overhaul about two years ago None
Vendor equipment pricing PDF quotes in the quotes@ mailbox and distributor portals No owner. No arrival date recorded None
The adjustment layer (access, prevailing wage, customer history, crew) Doug Wetzel's working practice. Not recorded anywhere No owner because there is no document to own None
Service rate schedule markup tiers SharePoint Adjusted over the years. Reasons not recorded beside the adjustments None
Post-job cost review output A recurring meeting and a spreadsheet Terry Hobbs. Monthly Partial
Margin guidance memo (the 22 percent retrofit floor) SharePoint Brian Aldridge. Set at acquisition, not reviewed since Partial
Annual labor rate sheet SharePoint Terry Hobbs. Annual, dated Maintained
Takeoff files FastPIPE and FastDUCT, per job The estimator on the job. Per bid Maintained
Service and equipment history BuildOps Renee Suggs. Live Maintained
Custody is assessed on three questions: is there a marked current version, is there a named owner, and is there a review date. Maintained means all three. The four shaded rows are the ones the build depends on.

The pattern is worth naming plainly, because it decides what the build has to do first. The three maintained sources are the three that a piece of software already keeps for you. The four with no custody are the four that live in documents and habits, and those are the ones every bid actually turns on.

05The baseline

These are the numbers any later work gets judged against.

Captured before anything changes, so that improvement is measurable in your records and not in our claims. All four are drawn from the trailing twelve months.

About 28 percent of estimating time goes to questions a maintained source would answer.
Roughly 1,900 estimating hours a year across three estimators, split by what the hours went to.
Hours a year, observed sample
1,365 hrs estimating 535 hrs, about 28% 407 hrs chasing current vendor prices 128 hrs reconciling workbook versions 1,900 hours a year, three estimators
Hours per bid come from the nine observed bids and are extrapolated across 214. Treat the shape as sound and the precision as approximate.
Win rate is not one of your problems.
Bids submitted and won by estimator. Nothing here is marked, because nothing here is a finding.
Trailing twelve months
EstimatorBidsWonWin rateRevenue
Doug Wetzel711825.4%$4.3M
Alan Prewitt782228.2%$2.8M
Cody Sturgill651827.7%$1.5M
All2145827.1%$8.6M
Doug bids the larger installs, which win less often across the trade, so his lower rate against a higher revenue figure is the expected pattern and not a concern.

The four measures, as of today

  • Quote turnaround: 6.4 business days, medianNinetieth percentile 14 days. 22 of 214 bids went out after the customer's stated deadline.
  • Estimator hours per bid: 5.2 retrofit, 14.8 install and tenant improvementMedians from the observed sample.
  • Win rate: 27.1 percent overall31.1 percent on retrofits, 20.7 percent on install and tenant improvement.
  • Margin against estimate: 23.8 percent bid, 22.1 percent realizedA blended fade of 1.7 points, examined in the next section.
06The analysis

The estimator spread survives when you control for the job mix, which is what makes it a real finding.

Realized margin does differ by estimator, and on its own that proves nothing, because the three of them bid different work. Doug takes the large installs, Cody takes small retrofits, and job types carry different margins for reasons that have nothing to do with who priced them. So the raw comparison is the beginning of the analysis and not the end of it.

To settle it we isolated one job type all three estimate: rooftop-unit replacement retrofits between 5 and 25 tons with no controls scope. Thirty-four of them closed in the last twelve months. On that like-for-like set the spread does not disappear. It narrows from 5.7 points to 4.5, and 4.5 points on identical work is the finding.

Across all project work the spread is 5.7 points, and part of that is the different work they bid.
Bid margin and realized margin by estimator. The distance between the two marks is margin fade.
Gross margin, all project work
Compare
16%18%20% 22%24%26% Doug Wetzel 23.9% Alan Prewitt 21.4% Cody Sturgill 18.2% Filled dot: realized · Tick: bid Spread, best to worst: 5.7 points
Realized margin from QuickBooks job costing on closed jobs. Bid margin from the bid file. All 58 won and closed jobs in the trailing twelve months.

Two things follow from the like-for-like cut. The first is that the gap is not seniority: Alan Prewitt has eleven years in and prices 1.8 points below Doug on the same job type. The second is that fade tracks the same order. Doug loses 0.9 points between bid and realized, Alan 1.7, Cody 4.2, which says the adjustments are not only pricing the job better, they are pricing it more accurately.

The mechanism behind the fade is separately visible in the cost data. On the 34 comparable jobs, actual equipment cost ran 3.1 percent above the workbook figure on average. That is the two vendor price rounds the master workbook never absorbed, and it lands hardest on whoever is relying on the workbook alone.

07The value

The gap is $155,000 a year, and about $95,000 of it is reachable.

Holcombe realized 22.1 percent on $8.6M. Doug realized 23.9 percent. Closing the whole distance would be worth $155,000 a year, and closing the whole distance is not a realistic target, because some of what Doug does is twenty-eight years of pattern recognition that no written rule will fully capture.

So the honest number is a share of that gap. What share is a judgment, and we cannot measure it for you. Below is the arithmetic with the judgment left in your hands. Change the assumption and the number moves.

What the build would be worth at different recovery assumptions.
Recover, of the gap
Project revenue
$155,000
The full measured gap, at 1.8 points
$85,000
Recovered gross margin a year, at the assumption above
8%
Of a pretax income of about $1.07M
Pretax income of $1.07M is 6.7 percent of $16M, the median CFMA reported across 1,558 construction companies for fiscal 2024. It stands in until we have your actual figure. Our own recommendation is the middle assumption, and we would sooner spend the time agreeing the four measures, because once those are agreed the answer comes out of your own records and nobody has to argue about our estimate.

What is deliberately not counted

Turnaround is the obvious one. On-time bids won 29.2 percent last year and late bids won 9.1 percent, and it is tempting to price the 22 late bids at the difference. We have not, because bids are often late for the same reasons that make them hard to win: a complicated scope, an RFQ that arrived with no time in it. The relationship is real and the direction of cause is not established, so it stays out of the number and goes on the list of things the build should make measurable.

The 535 hours of estimating time is also not counted as money. Freed hours only become margin if they go to more bids or fewer estimators, and which of those happens is your decision, not an outcome we can book on your behalf.

08Allocation

Of the fifteen tasks in a quote, seven go to software and five do not move at all.

This is the part of the diagnosis that decides what gets built. We broke the workflow into its actual tasks and put each one where it is handled best, on the evidence of what we watched. Some tasks want software. Some want a person with a better tool. Some want a process fix and no technology whatsoever. Some are exactly right as they are, and the correct recommendation for those is to leave them alone.

No technology needed. The inquiry arrives in the shared mailbox and nobody records the date, which is why turnaround cannot currently be measured. A logged arrival date costs nothing and it is the first of the four measures.
A commercial judgment about a customer, a schedule and a competitor. It takes about ten minutes and it is made well. Nothing we could add here would improve it.
The walk stays exactly as it is, and it is the most valuable hour in the workflow. What changes is the capture: today it is a notebook and a phone camera, and half of what gets noticed on the roof never reaches the bid file. A structured capture form on the phone, tied to the job, would put it there.
FastPIPE and FastDUCT do this well and feed the workbook cleanly. There is no case for touching it, and we have no interest in recommending that you replace software that works.
Mechanical lookup against an approved workbook, with every line citing the assembly row it came from. This is the task the drafter exists to do, and it only works once one workbook is marked as the master.
The 1.9 hours a bid your estimators spend here is the largest single piece of recoverable time in the workflow. It depends entirely on the intake path existing first: quotes landing in one place, dated on arrival.
This is a check with no judgment in it. Anything older than 45 days is flagged and held out of the draft, in an exception queue. It is a rule with a number in it, and rules with numbers should not depend on somebody remembering them.
The rate sheet is dated, owned and annual, which makes it the easiest source in the inventory to read from. No change to the rates themselves is proposed.
The task this whole diagnosis is about. Once the adjustments are written down with their reasoning, software can propose which ones apply to a given job and show why. The estimator decides whether they do. That split is deliberate and permanent: the software puts the rule in front of the estimator, and the estimator decides the job.
Plain-code checks against the proposal checklist you already have. Two of the nine bids we observed went out with an arithmetic error that a check would have caught, neither of them consequential, both of them avoidable.
The 22 percent retrofit floor is a written rule that is currently checked by memory. Today it is a reminder. Making it a stop is a one-line change with real consequences: anything below the floor cannot be sent without an explicit override from a named person.
Never automated, at any point, under any measured result. The reasons are set out in the next section.
Your proposal template, filled from the approved bid. The customer receives the same document they receive today. None of the citations, flags or internal reasoning appears on it.
A named estimator approves every proposal before it leaves the building, exactly as today. What changes is that the approval is recorded against the bid, so a question six months later has an answer.
The open loop. Post-job reviews already happen and Terry runs them well. The correction simply has to reach the workbook, which today it does not. Start this by hand in the monthly meeting; software can carry it later, and there is no reason to wait for software to begin.
Seven tasks go to software, all of them lookups and checks. One is drafted by software and decided by a person. Five do not change at all, including the two that matter most: the site walk and the final price. Two are process fixes that need no technology and can start next week. Some of what we recommend has no AI in it, and the tasks we would leave alone are as much a part of the recommendation as the ones we would build.
09The risk pass

Six positions are fixed before any build starts, and none of them is negotiable against a measured result.

A diagnosis that only says what could be automated is half a diagnosis. These are the limits we would hold to, and we would rather you hold us to them in writing.

  • Final pricing judgment and sign-off stay with the estimatorNo exception, no threshold at which this relaxes, and no measured improvement that would justify revisiting it. The price is a commercial commitment your company makes to a customer, and a person makes it.
  • No proposal leaves the building without a named human approverThe approval is recorded against the bid with the name and the time.
  • The margin floor is a stop, not a warningA draft below 22 percent on retrofit work cannot be sent. It goes to an exception queue and needs an explicit override from a named person, recorded with the reason.
  • Stale vendor pricing cannot silently price a bidAnything past 45 days is flagged before the draft is produced, not after.
  • Nothing is priced from an unapproved baselineDoug approves the workbook and the adjustment rules before anything reads from them. If he has not approved it, the software does not use it.
  • Nothing leaves your Microsoft 365 tenantEverything runs inside Holcombe's own environment under Holcombe's own permissions. No customer pricing, no job costing and no vendor terms move to an outside service.

There is a general position underneath these six. Your estimators hold the job; software does tasks inside it. However much of the drafting a machine takes on, every task rolls up to a person who owns the result, and the system is designed so that person can always see what the machine did and why.

10Prerequisites

Four things have to be true before a drafter is worth building, and three of them are yours to do.

Software that prices from a source nobody owns produces confident, wrong numbers faster than a person can. The order below is not a preference, it is a dependency: each step is worthless until the one before it is done.

  • One workbook is marked as the masterDoug decides which of the four copies is current, the master is marked and owned, and the other three go read-only. The tweaks in the personal copies get reviewed, and the ones he endorses go into the master. Roughly a day of his time. Yours to do, and you can start this week.
  • Vendor pricing has one intake path, dated on arrivalOne destination for every emailed quote, with the arrival date recorded. Until this exists, task 06 in the allocation cannot be built at all. Yours to do.
  • The adjustment layer is written down and approvedThis is what we would do with Doug: eliciting the rules, writing each one next to the numbers it changes, recording the reasoning, and getting his name against the result. Estimated at about two hours a week of his time over three to four weeks. Ours to run, his to approve.
  • The four measures are being loggedTurnaround is the easy one and it can start immediately. The other three come out of records you already keep. Without them the build cannot be judged and we would be asking you to take our word for it.

The first, second and fourth need nothing from us. If you did those three and stopped, quoting would be measurably better than it is today, and that is a fine outcome.

11Recommendation

Build the drafter, pilot it on rooftop replacements, and let the measures decide whether it widens.

Rooftop-unit replacement retrofits are the right pilot for three reasons: it is the job type where the margin gap is widest, the jobs repeat often enough to produce a signal inside a quarter, and it is the set we already measured, so the baseline exists. BEX-118, the Bexley Foods store 118 replacement we watched during the diagnosis, is a representative example.

The first live-assisted bid lands about nine weeks in, and the gate that matters is the one at the end.
The build stages against the prerequisites, with the measure gate marked.
Weeks from start
246 81012 Prerequisites The adjustment layer The drafter Pilot on rooftops Keep, widen, adjust or stop
Durations are our planning estimate and would be agreed with you before anything starts. The prerequisite bar is hatched because most of that work is yours, not ours.

The outcome we would agree up front

  • Realized margin on rooftop replacement retrofits priced by Alan and Cody reaches 22.5 percent blendedFrom 21.8 and 19.1 today, measured on closed jobs, two quarters after the pilot begins.
  • Median quote turnaround falls below 4 business daysFrom 6.4 today.
  • Estimator hours per retrofit bid fall below 4From 5.2 today.
  • Above 95 percent of the numbers in a draft cite a source that is currentFrom no citation at all today.

Agree this scope and its outcome, or stop with this document. At the twelve-week gate the measures decide what happens next, and stopping is one of the four available answers. Everything built to that point runs in your tenant, belongs to you, and comes with a written handover.

12Out of scope

Five things sit next to quoting that we did not examine, and one of them is probably the next place to look.

The diagnosis was scoped to project quoting from inquiry to signed proposal, and we held to that. What follows is what we noticed at the edges without investigating, recorded so that it is on the table rather than in our heads.

  • Service quoting and the rate schedule markup tiersThe tiers were adjusted over the years and the reasons were not recorded beside them, which is the same failure as the adjustment layer in a different document. This is the strongest candidate for the second piece of work.
  • Maintenance agreement pricingA different model with different economics. Renewals appear to be priced off the prior year, and we did not test whether that still tracks the cost to serve.
  • Change ordersSeveral people mentioned that change orders are where retrofit margin is recovered or lost. Nothing in the diagnosis touched them and we have no view.
  • Purchasing and buyoutThe gap between the quoted equipment cost and the purchased equipment cost sits here, and our 3.1 percent variance figure cannot distinguish a stale workbook from a buyout problem.
  • The QuickBooks positionQuickBooks Desktop Enterprise has no cloud interface, so job-cost data reaches anything else as an export. That is workable and it constrains what can be automated later. Any Sage Intacct decision should be made on its own merits and not on account of this work.

We also did not form a view on the loss reasons, because the data to form one does not exist yet. Capturing why a bid was lost is the cheapest piece of new measurement available to you and it would change what the next diagnosis could answer.

13Working together

Everything runs in your environment, belongs to you, and stops cleanly at any gate.

  • A named owner on each sideOurs, and yours or your delegate. Weekly working session during the build, and a short written note after each one.
  • Inside your tenantEverything runs in Holcombe's Microsoft 365 environment under Holcombe's permissions. Nothing moves to an outside service.
  • Yours, including the parts we wroteThe workbook, the adjustment rules, the intake path, the drafter configuration and this document belong to Holcombe. Where a third-party licence is involved it is in your name.
  • Stopping is a documented handoverAt any gate, in writing, with whatever has been built left running. It is not a negotiation.
  • No vendor tiesWe do not resell anything and we take nothing from any tool we recommend. Our interest is in the measures moving, because that is what would earn the next piece of work.