The diagnosis · proposal development

About $268,000 a year of work is done at standard rates and not recovered in fee, and it follows who scoped the engagement.

Two and a half weeks inside proposal development at Whitlow Ferris Partners, from a sponsor's request to the proposal and SOW going out. What proposals run on, what the realization gap is worth, where each task belongs, and the first build we would recommend.

Prepared forEllen Marchetti, Managing Partner FirmWhitlow Ferris Partners ScopeProposal development, request to proposal out BasisSeven live scoping calls, 61 proposal records

This document belongs to Whitlow Ferris Partners. It stands on its own whether or not any further work happens. Every number in it is drawn from your own records in BigTime, HubSpot, and the Proposals library, and each one says which record it came from.

01What we found

Realization on comparable fixed-fee work varies thirteen points by the partner who scoped it, because the adjustments that make the difference are applied only when Ellen scopes.

Across the last twelve months the firm realized 92.7 percent of standard-rate value on $6.3M of fixed-fee work. Ellen Marchetti's engagements realized at 97 percent, Marcus Delgado's at 92, and Rob Askew's at 85. Had Marcus and Rob's fixed-fee revenue realized at Ellen's rate, the firm would have billed about $268,000 more for the same hours.

The cause is specific. All three partners scope from the same proposal template, the same rate card, and the same assumptions tab in the pricing workbook. Ellen then adjusts for what the tab cannot see: whether the sponsor is a repeat client, whether the portfolio company closes its books inside ten days, whether the engagement lands before or after the close, which engagement manager is free, and how likely a founder-led company is to widen the scope. Her adjustments are sound and mostly consistent. They exist nowhere except in the proposals she personally scopes, so the other two partners scope without them, and the realization follows.

Most of proposal development is in good order, and it matters to say so. The template is a competent document, the rate card is reissued every January, the win rate is ordinary for sponsor-referred work and does not vary in a way that means anything, and BigTime records the hours cleanly. The problem is confined to how the scoping sources are kept and what sits on top of them.

$268,000
Standard-rate value a year worked and not recovered, on Marcus and Rob's fixed-fee work
13 pts
Realization spread between partners on 21 comparable five-week diagnostics
30%
Of proposal time spent finding past material and confirming which rates and assumptions are current

What we recommend

Write down the scoping rules with an owner against each one, mark which copy of each source is current, and put a proposal drafter in front of the partners that drafts from those sources and cites every figure and every scope sentence. Pilot it on the five-week operational diagnostic, where the gap is measured and the engagements repeat. Of the $268,000, we would expect to reach $140,000 to $190,000 inside twelve months, and we would agree the measures up front so you can judge it in your own numbers.

02Method

We sat in on seven live scoping calls and then reconciled what we saw against twelve months of records.

Interviews about a workflow return the procedure. We wanted proposal development as it is done today, so the two and a half weeks were spent alongside the three partners through seven scoping calls and the proposals that followed them: the request in proposals@, the call with the sponsor, the search for comparable past proposals, the pricing, the scope and assumptions, the partner review, and the send. Three of the seven calls were Ellen's, two were Marcus's, and two were Rob's. Where what we saw differed from what the template and the tab said, we recorded both.

The observed calls tell you how and why. They do not tell you how much, so the second half of the diagnosis reconciled them against your records: 61 proposals in HubSpot and the Proposals library for the trailing twelve months, realization by engagement out of BigTime for the 26 that were won, the proposal template in its three copies, the pricing workbook and its assumptions tab, the rate card in force and the one on SharePoint, and the SOWs in DocuSign.

What we could measure, and what we could not

  • Measured from your recordsProposals submitted and won by partner, turnaround from request to proposal out, realization by engagement and by the partner who scoped it, and hours charged against hours planned on completed diagnostics.
  • Measured by observation, and therefore a sampleHours per proposal and how those hours are spent. Seven proposals is enough to show the shape and not enough to be precise. The hours figures in this document carry that caveat wherever they appear.
  • Could not be measuredWhy a proposal was lost. HubSpot has a closed-lost stage and no reason against it, and neither our observation nor your records can reconstruct one. This is the largest hole in the picture and it is worth closing whatever else you decide.

One engagement scoped before the diagnosis began, ENG-2634 at Tolland Wire Products, was in its second week as this document was written and appears again in the analysis as the live instance of the pattern.

03Current state

A proposal takes 5.5 business days against the five the sponsors usually ask for, and the two slowest steps are the two that wait on information.

The sequence itself is sound and all three partners run it the same way. What varies is how long each step takes, and the variation concentrates in the two steps that depend on information held somewhere else: finding the comparable past proposals and case examples, which are in the Proposals library, the Engagements library, and the partners' own OneDrive folders, and confirming which rates and scoping assumptions are current, which means checking the January email against the SharePoint copy and the tab.

Finding material and confirming what is current take 2.5 of the 5.5 days and carry all of the observed rework.
The seven steps of a proposal, drawn to scale. Marked in red: where the observed hours go.
Median business days, 61 proposals
5.5 days, median 0.30.91.4 1.10.90.6 0.3 Requestlogged Scopingcall Comparableproposals found Rates andassumptions confirmed Scope andfee drafted Partnerreview Out With the sponsor,on Zoom 4.2 hrs a proposal finding pastproposals and case examples andchecking which rate card andwhich assumptions are current Ellen's adjustments,applied only to theproposals she scopes
Step medians are computed from the request and sent dates on the 61 proposal records in HubSpot and the Proposals library and sum to the 5.5-day median. The marked span, finding material plus confirming what is current, is 2.5 days. Hours per proposal come from the seven observed proposals and are a sample.

Fourteen of the 61 proposals went out after the date the sponsor asked for. That is 23 percent of everything the firm proposed last year. What happens to those fourteen is examined on its own sheet, because the relationship between a late proposal and a lost one is easy to over-read.

04The inventory

Everything a proposal needs is written down, and the four sources every proposal depends on have no marked current version, no owner, and no review date.

Whitlow Ferris Partners is not a firm that keeps its method in somebody's head. The proposal template, the pricing workbook, the rate card, the case one-pagers, and eleven years of readout decks are all written down, in the ordinary ways firms write them down, and most of it is good. What is missing is custody: which copy is current, who owns it, when it was last checked, and where the reasoning behind a scoping choice is recorded.

The template, the assumptions tab, and the adjustments are the sources every proposal depends on, and they are the least maintained.
Ten sources proposal development reads from, with custody assessed against the same standard.
Ten sources
SourceWhere it livesOwner and reviewCustody
Proposal template (PowerPoint, with the Word SOW) v7 on SharePoint, v7-EM in Ellen's OneDrive, v6 still in use by one principal No owner. Nothing marks which copy is current None
Scoping assumptions (the tab in the pricing workbook) SharePoint, inside the pricing workbook No owner. Still says six weeks at three FTE; the firm has run diagnostics at five weeks and two and a half FTE since 2024 None
The adjustment layer (repeat sponsor, close cycle, timing against the deal, staffing, founder-led scope risk) Ellen Marchetti's working practice. Not recorded anywhere No owner because there is no document to own None
Sponsor preferences (how Larkspur Ridge wants a readout structured, which KPIs its deal team reads first) The partners' inboxes and memory No owner. Not written down None
Rate card RC-2026 in a January email; RC-2024 on SharePoint Reissued each January. The copy where proposals are written is the old one Partial
Case one-pagers SharePoint, WFP Knowledge library Nate Ferreira keeps the files. No review date; several cite outcomes later revised Partial
Readout decks, about 140 over eleven years SharePoint, Engagements library, one folder per engagement Complete and filed. Not indexed for scoping, so the firm's view on a typical savings range sits in forty decks Partial
The pipeline HubSpot The partners. Some opportunities sit in inboxes and reach HubSpot late or not at all Partial
Hours, budgets, and realization by engagement BigTime Carla Stimson. Live Maintained
Executed SOWs and MSAs DocuSign Carla Stimson. Per engagement Maintained
Custody is assessed on three questions: is there a marked current version, is there a named owner, and is there a review date. Maintained means all three. The four shaded rows are the ones the build depends on. Assessed on the Proposals and WFP Knowledge libraries as they stood during the diagnosis.

The pattern decides what the build has to do first. The two maintained sources are the two that a piece of software already keeps for you. The four with no custody are the four that live in documents and habits, and those are the ones every proposal turns on.

05The baseline

These are the numbers any later work gets judged against.

Captured before anything changes, so that improvement is measurable in your records and not in our claims. All four are drawn from the trailing twelve months.

About 30 percent of proposal time goes to finding material and confirming what is current.
Roughly 850 proposal hours a year across the three partners and the managers who help, split by what the hours went to.
Hours a year, observed sample
595 hrs scoping, pricing, writing, and reviewing 255 hrs, about 30% Finding comparable past proposals and case examples Confirming which rates and scoping assumptions are current About 850 hours a year, 61 proposals at a median of 14 hours
Hours per proposal come from the seven observed proposals, a median of 14 hours with 4.2 of them finding material, and are extrapolated across 61. Treat the shape as sound and the precision as approximate. BigTime does not record proposal time by task.
Win rate is not one of your problems.
Proposals submitted and won by the partner who led them. Nothing here is marked, because nothing here is a finding.
Trailing twelve months
PartnerSentWonWin rateRevenue
Ellen Marchetti241250.0%$4.1M
Marcus Delgado19842.1%$2.9M
Rob Askew18633.3%$2.4M
All612642.6%$9.4M
Counts from HubSpot closed-won and closed-lost stages, checked against the Proposals library. Revenue is the trailing twelve months of billing in BigTime on engagements the partner led, fixed fee and time and materials together. With eighteen to twenty-four proposals per partner, two or three outcomes move a win rate several points, and the spread here is within what sponsor-referred work ordinarily shows.

The four measures, as of today

  • Turnaround: 5.5 business days, medianFrom the sponsor's request to the proposal out. The sponsors' usual ask is five. 14 of 61 went out after the date asked for.
  • Hours per proposal: 14, medianFrom the observed sample. 4.2 of them finding material and confirming what is current.
  • Realization on fixed-fee work: 92.7 percent, revenue-weightedEllen 97 percent, Marcus 92, Rob 85, on $2.9M, $2.0M, and $1.4M of fixed-fee revenue. Examined on the next two sheets.
  • Win rate: 42.6 percent26 of 61. Recorded as a baseline and not as a finding.
06The analysis

The realization spread survives when you control for the engagement mix, which is what makes it a real finding.

Realization does differ by partner, and on its own that proves little, because the three of you sell different work. Rob scopes more diligence-phase and first-engagement work, Marcus carries the sponsor pricing conversations, and engagement shapes realize differently for reasons that have nothing to do with who scoped them. So the raw comparison is the beginning of the analysis and not the end of it.

To settle it we isolated one product all three of you sell and scope the same way: the five-week operational diagnostic, priced at the same standard fee from the same rate card. Twenty-one of them completed in the last twelve months. On that like-for-like set the spread does not disappear. It is 13 points of realization, and 85 hours per engagement between Ellen's diagnostics and Rob's, on the same product at the same fee.

Across all fixed-fee work the spread is 12 points, and part of that is the different work each partner scopes.
Realization by the partner who scoped the engagement. The line runs from each partner to Ellen's rate; its length is the gap.
Realization, all fixed-fee work
Compare
80%84%88% 92%96%100% Ellen Marchetti $2.9M fixed fee 97% Marcus Delgado $2.0M fixed fee 92% Rob Askew $1.4M fixed fee 85% Dot: realization · Tick: Ellen’s rate Spread, best to worst: 12 points
Realization from BigTime: fees billed over the standard-rate value of hours charged, on fixed-fee engagements that billed in the trailing twelve months, grouped by the partner who scoped the proposal. Time-and-materials work is excluded because it realizes at the rate by construction.

Two things follow from the like-for-like cut. The first is that the gap is not experience: Rob co-founded the firm and has scoped diagnostics for eleven years, and his run 85 hours over Ellen's on the same product. The second is that hours track the same order as realization. Ellen's eight diagnostics ran 535 hours against 520 planned, Marcus's seven ran 560, and Rob's six ran 620. The fee is the same on all of them, so every hour over plan comes straight out of realization.

What Ellen does differently is on the record in her proposals and nowhere else. Where a portfolio company does not close its books inside ten business days, her scope includes a data-readiness week and the fee includes it. Where the company is founder-led, her assumptions and exclusions are tighter. The other two partners scope from the tab, which knows about neither.

07The mechanism

The hours over plan are data cleanup nobody scoped, and scope that widened at founder-led companies.

We read the engagement files and the BigTime hours by week on the 21 comparable diagnostics. The overrun sits in two places. The first is the opening weeks, where the team cleans up the client's data before the diagnostic can start, at companies that close their books slowly and were scoped as though they did not. The second is the later weeks, at founder-led companies where the owner added questions mid-engagement and nobody had written an exclusion that let the partner say no.

Rob's diagnostics run 100 hours over the 520 planned; Ellen's run 15 over.
Median hours charged per completed five-week diagnostic, by the partner who scoped it, against the 520 hours the standard scope plans for.
Hours per engagement, 21 diagnostics
400450500 550600650700 520 planned Ellen Marchetti 8 diagnostics 535 hrs, 15 over Marcus Delgado 7 diagnostics 560 hrs, 40 over Rob Askew 6 diagnostics 620 hrs, 100 over
Hours charged from BigTime on the 21 completed diagnostics, medians by partner. The 520 planned hours is the standard scope under the firm's current practice, five weeks at two and a half FTE; the fee on every one of the 21 was built on that scope. The assumptions tab still reads six weeks at three FTE and says nothing about the client's close cycle; the week missing from these engagements is the data-readiness week.

The same pattern is visible in a live engagement. ENG-2634 at Tolland Wire Products was scoped by Rob from the assumptions tab with no data-readiness week, at the standard fee of $161,000. Tolland closes its books in about twenty days. At week two the engagement is eleven percent over budget on hours, all of it in data cleanup, on a fixed fee.

08A correlation

Late proposals win less often, and we do not count that as money, because the direction of cause is not established.

Fourteen of the 61 proposals went out after the date the sponsor asked for. Those fourteen won at a much lower rate than the rest, and it is tempting to price the difference. We have not, because proposals are often late for the same reasons that make them hard to win: a complicated scope, a sponsor who asked for it in two days, a first engagement with a new sponsor where the comparable material takes longer to find. The relationship is real. What it is worth cannot be read from these records.

On-time proposals won 23 of 47; late proposals won 3 of 14.
Proposals by whether they went out by the date the sponsor asked for, and how they closed. Stated as a correlation.
Trailing twelve months
SentProposalsWonWin rate
By the date asked for472348.9%
After the date asked for14321.4%
All612642.6%
The date asked for is taken from the sponsor's request email where one was stated and from the HubSpot note where it was not; a proposal with no stated date is counted as on time. Fourteen late proposals is too few to separate lateness from the reasons for it.

So turnaround stays out of the value on the next sheet and goes on the list of things the build should make measurable. If the median falls from 5.5 days to the five the sponsors ask for, and the late count falls with it, the win rate on those proposals will show whether lateness itself was costing wins, in your own records and without anyone having to argue about it.

09The value

The gap is $268,000 a year, and we would expect $140,000 to $190,000 of it to be reachable inside twelve months.

Marcus realized 92 percent on $2.0M of fixed-fee work and Rob 85 percent on $1.4M. Ellen realized 97 percent. Bringing both to her rate is five points on $2.0M and twelve points on $1.4M, which is $100,000 plus $168,000, or $268,000 a year of standard-rate value worked and not recovered in fee. Closing the whole distance is not a realistic target, because some of what Ellen does is eleven years of pattern recognition that no written rule will fully capture, and because a rule written in the first quarter takes the rest of the year to reach every proposal.

So the honest number is a share of that gap. What share is a judgment, and we cannot measure it for you. Below is the arithmetic with the judgment left in your hands. Change the assumption and the number moves.

What the build would be worth at different recovery assumptions.
Recover, of the gap
Brought to Ellen’s rate
$268,000
The full measured gap, a year
$165,000
Recovered fee a year, at the assumptions above
10%
Of a pretax income of about $1.7M
Pretax income of $1.7M is an eighteen percent margin on $9.4M, the figure the assessment used as its anchor. It stands in until Carla's actual figure from QuickBooks replaces it. Our own estimate is the 52 to 71 percent band, $140,000 to $190,000 in the first twelve months, with the midpoint at about $165,000. We would sooner spend the time agreeing the four measures, because once those are agreed the answer comes out of BigTime and nobody has to argue about our estimate.

What is deliberately not counted

Turnaround, for the reason on the previous sheet. The 255 hours a year of finding material is also not counted as money. Freed partner hours only become fee if they go to more proposals, more billable work, or the sponsor relationships, and which of those happens is your decision, not an outcome we can book on your behalf.

Two other measurements from the diagnosis are recorded and not valued, because they belong to other workflows. The last six hires reached sixty percent utilization at a median of 7.5 months, against the four to five the partners expected. Nine of the 26 readouts in the past year had three or more slides changed inside the last forty-eight hours before they were presented. Both are evidence for later phases of the build and neither is in the $268,000.

10Allocation

Of the fifteen tasks in a proposal, eight go to software and four do not move at all.

This is the part of the diagnosis that decides what gets built. We broke proposal development into its tasks and put each one where it is handled best, on the evidence of what we watched. Some tasks want software. Some want a person with a better view of the firm. Some want a process fix and no technology whatsoever. Some are right as they are, and the correct recommendation for those is to leave them alone.

A partner reads the sponsor's email and decides what is being asked for and whether the firm wants it. It takes a few minutes and it is done well. What changes is only that the request is logged with its arrival date when it lands in proposals@, which is the first of the four measures and needs no software.
A lookup. The account summary for the sponsor and the portfolio company (ACC-LARK, ACC-REDF, and the rest), the HubSpot record, past engagements with the sponsor, and whatever preference is written down for it (SP-2). Today this is a partner's memory and inbox search.
The 4.2 hours a proposal your partners spend here is the largest single piece of recoverable time in the workflow. The software retrieves the closed engagements with the same shape and sector (ENG-2611, ENG-2598), their proposals and SOWs, and the case examples drawn from them (CASE-2611, CASE-2598), each with its record cited. It depends on the engagement records being marked as the current ones.
A diagnostic, an implementation sprint, a 100-day plan, or an interim seat. This is the partner's read of the sponsor, the company, and the deal, and nothing we could add here would improve it.
The partner and Priya decide who goes, exactly as today. What changes is what they can see when they decide: the bench in the next four weeks out of BigTime, and the staffing rule (ST-5) checked against the names proposed. Today the bench is a Monday conversation.
Weekly rates from RC-2026 times the scoped weeks by role, every line citing the rate it used. Mechanical arithmetic that today is done in whichever copy of the workbook the partner opened. It only works once one rate card is marked as the one in force.
Ten percent off a diagnostic for a repeat sponsor, nothing off implementation, nothing on a first engagement with a new sponsor (FR-2). A rule with a number in it, and rules with numbers should not depend on somebody remembering them. The software applies it and shows which clause it applied.
The task this whole diagnosis is about. Once Ellen's adjustments are written down with their reasoning (SC-4: a data-readiness week when the company does not close its books within ten business days of month end), the software can check the close cycle in the account summary, propose the week, and show why. The partner decides whether it goes in. That split is deliberate and permanent: the software puts the rule in front of the partner, and the partner scopes the engagement.
Drafted from the scope language of the comparable engagements and the current template, every sentence citing the proposal or SOW it came from. The partner edits it. The draft is a starting point that took minutes to assemble, in place of the one that took an afternoon to find.
From the scoping rule (SC-4) and the assumptions and exclusions in the comparable SOWs, including the exclusion language from Ellen's v7-EM copy of the template that never reached the SharePoint copy. This is where the founder-led scope risk gets written down before the engagement starts.
The Word SOW filled from the approved proposal: scope, team, weeks, fee, assumptions, exclusions. The sponsor receives the same document they receive today. None of the citations, flags, or internal reasoning appears on it.
FR-2 says a fee below ninety percent of standard-rate value needs Ellen's written approval. Today that is checked by memory. Making it a stop is a one-line check with real consequences: a proposal under the floor goes to an exception queue and cannot be sent until Ellen approves it, with her name and the time recorded.
The partner reads the whole proposal and approves it, exactly as today. What changes is what arrives on the desk: a draft where every figure and every scope sentence says where it came from, with the open flags listed at the top, so the review is spent on the judgment and not on checking the arithmetic.
A named partner sends every proposal, from their own mailbox, exactly as today. The software never sends. What changes is that the approval is recorded against the proposal record, so a question six months later has an answer.
No technology needed. The HubSpot stage gets a reason when a proposal is lost, and BigTime gets a field for who scoped the engagement, so realization can be read by partner without the reconciliation we did by hand for this document. Carla can start both this month.
Eight tasks go to software, all of them lookups, drafts from cited sources, and checks. One is drafted by software and decided by a person. Four do not change at all, including the two that matter most: choosing the engagement shape and sending the proposal. One wants a better view of the bench, and one is a process fix that needs no technology and can start this month. Some of what we recommend has no AI in it, and the tasks we would leave alone are as much a part of the recommendation as the ones we would build.
11Recommendation

Write the firm's scoping rules down with owners, build the proposal drafter on them, and let the measures decide whether it widens.

The build has two parts, and the order matters. The first is the memory: the firm's rules written down once, each with an owner and the reason beside it, and the records the rules apply to. Ten rules came out of the diagnosis, and the four that proposals turn on are the scoping rule (SC-4, Ellen), the fee rule (FR-2, Ellen with Marcus on sponsor pricing), the staffing rule (ST-5, Priya), and the sponsor preferences (SP-2, Marcus). Beside them sit the kept records: the account summaries, the engagement records, the case examples, the rate card in force, and the playbook.

The second part is the proposal drafter, which reads from that memory and nothing else. It assembles the draft proposal and SOW with every figure and every scope sentence citing its basis, runs the plain-code checks (rates against RC-2026, weeks against SC-4, the fee against the ninety-percent floor, the discount against FR-2), lists what it could not settle, and hands the draft to the partner. The partner scopes, approves, and sends. The five-week operational diagnostic is the right pilot because it is the product where the gap is measured, the engagements repeat, and the baseline already exists.

The first live-assisted proposal lands about nine weeks in, and the gate that matters is the one at ninety days.
The build stages against the prerequisites, with the measure gate marked.
Weeks from start
246 81012 Prerequisites The rules, written down The drafter Pilot on diagnostics Keep, widen, adjust or stop
Durations are our planning estimate and would be agreed with you before anything starts. The prerequisite bar is hatched because that work is yours, not ours: naming the current template and retiring the other copies, putting the rate card where proposals are written, and adding the who-scoped field in BigTime.

What comes after, if the measures say so

The same memory can carry other readers, and none of them is in this recommendation. A deliverable assembler that builds a readout skeleton from the playbook module and the engagement's own extracts. A desk that answers a new consultant's questions from the playbook and the approved rules, and says so when something is not documented. A Monday brief with utilization, pipeline, realization, unbilled work, and receivables, every number linked to its BigTime or HubSpot record. A debrief line that reads the final readout and the debrief call and queues the changes to Priya. Each would be its own scoped piece, agreed on its own evidence, after the drafter has earned it.

12The risk pass

Five positions are fixed before any build starts, and four risks are named so they can be watched.

A diagnosis that only says what could be automated is half a diagnosis. These are the limits we would hold to, and we would rather you hold us to them in writing.

  • The scope and the fee stay with the partnerNo exception, no threshold at which this relaxes, and no measured improvement that would justify revisiting it. A proposal is a commitment the firm makes to a sponsor, and a partner makes it.
  • No proposal leaves without a named partner approving and sending itThe software drafts and checks. It never sends. The approval is recorded against the proposal record with the name and the time.
  • The ninety-percent floor is a stop, not a warningA draft priced below ninety percent of standard-rate value cannot be sent. It goes to an exception queue and needs Ellen's written approval, recorded with the reason (FR-2).
  • Nothing is drafted from an unapproved sourceEllen approves the scoping rule and the fee rule, Marcus the sponsor preferences, Priya the staffing rule, before anything reads from them. If the owner has not approved it, the software does not use it.
  • Nothing leaves your Microsoft 365 tenantEverything runs inside the firm's own environment under the firm's own permissions. No sponsor material, no client data, no fee history moves to an outside service.

The risks we would watch

  • Some of Ellen's adjustments will not reduce to a ruleThe close cycle and the repeat-sponsor discount are rules with numbers in them. Her read of how likely a founder is to widen the scope is a judgment, and writing it down as a rule would make it wrong in the cases that need it most. The build writes down what is a rule, records what is a judgment as a question the drafter asks the partner, and does not pretend the second is the first.
  • A sponsor may want the partner's voice, not a templateDan Kowalczyk has worked with Ellen for three years and reads her proposals as hers. The draft is a starting point the partner rewrites where it matters, and the pilot measures whether the sponsor notices. If a sponsor does, the partner writes more of it by hand and the software keeps the arithmetic.
  • The rate card changes in JanuaryRC-2026 is in force until the new card is issued. If the memory still says RC-2026 in February, every draft is wrong by the increase. The rate card entry gets a review date of the first business day of January and an owner, and the drafter refuses to price from a card past its review date.
  • The temptation to let the drafter sendOnce the drafts are reliable, sending them without a partner reading them will look like a way to save an hour. It is the position above, and it does not relax with a measured result, because the hour saved is the hour in which the partner scopes the engagement.

There is a general position underneath these. Your partners hold the proposal; software does tasks inside it. However much of the drafting the software takes on, every task rolls up to a person who owns the result, and the system is designed so that person can always see what the software did and why.

13The plan

The first ninety days have four owners inside the firm, three measures, and a gate at the end.

The first three weeks are yours and need nothing from us. The rest runs as a weekly working session with a short written note after each one, and everything built stays in your tenant and belongs to you at every point.

Who owns what at Whitlow Ferris Partners

  • Ellen MarchettiNames the current proposal template and retires the other two copies. Sits with us while the scoping rule (SC-4) and the fee rule (FR-2) are written down with their reasons, about two hours a week for four weeks. Approves both before the drafter reads from them. Approves every fee under the ninety-percent floor.
  • Marcus DelgadoWrites down what is known about each repeat sponsor's preferences (SP-2), starting with Larkspur Ridge. Owns sponsor pricing inside FR-2 and the carve-out pricing gap, which stays visible as a known gap until he records a position.
  • Priya RamanOwns the staffing rule (ST-5) and the current versions of the deliverable templates and the playbook. Decides which of the two PB-100 copies is the approved one.
  • Carla StimsonAdds the who-scoped field in BigTime and reports realization by engagement and by partner monthly under the definitions in UT-1. Puts the rate card in force where proposals are written and holds its review date. Adds the loss reason to the HubSpot closed-lost stage.

What is measured, from your own records

  • Realization by engagement and by who scoped itFrom BigTime, monthly. Today 97 percent, 92, and 85 by partner on fixed-fee work; 13 points apart on comparable diagnostics. The measure that carries the value, read on diagnostics scoped after the pilot begins and completed.
  • Hours per proposalToday 14 at the median, with 4.2 of them finding material and confirming what is current. Logged per proposal in BigTime from the first week, so the next figure is a record and not a sample.
  • Turnaround from request to proposal outToday 5.5 business days at the median against the five the sponsors ask for, with 14 of 61 late. Logged from the arrival date in proposals@.

Agree this scope and its measures, or stop with this document. At the ninety-day gate the three measures decide what happens next, and stopping is one of the four available answers. Everything built to that point runs in your tenant, belongs to you, and comes with a written handover. We do not resell anything and take nothing from any tool we recommend; our interest is in the measures moving, because that is what would earn the next piece of work.